What a reviewable estimate package looks like
Start with the summary, then follow one number into the detail. The summary should identify the project, estimate purpose, document issue, pricing date, and included scope. Trade totals should reconcile with the underlying worksheet rather than exist as separate numbers that somebody must update by hand. A revision should explain what changed from the previous issue.
The detail can separate quantities, units, material rates, labor hours, equipment, and subcontractor quotations. Not every engagement needs every column. A quantity-only commission may deliberately leave pricing to the contractor; a preliminary budget may use assemblies because detailed selections are not available. The important point is that the output matches the decision and does not imply precision the documents cannot support.
Ask for an assumptions register alongside the numbers. Each unresolved question should have a location, proposed treatment, responsible reviewer, and next action. A missing door schedule, unspecified floor finish, or unconfirmed utility connection should remain visible until resolved. See the sample worksheet for an educational starting point, not a representation of a completed client deliverable.